Home / Expert Answers / Electrical Engineering / task-1-figure-1-33kv-feeder-over-current-protection-overload-factor-120-time-over-curre-pa114

(Solved): [TASK 1] Figure 1. 33kV Feeder Over Current Protection - Overload Factor: 120\%. - Time Over Curre ...



[TASK 1]
Figure 1. 33kV Feeder Over Current Protection
- Overload Factor: 120\%.
- Time Over Current Curve: IEC Standard Inve[TASK 2]
a) Construct the power system model of TASK 1 in ETAP and run Load Flow.
- Attach the snapshot of load flow result

[TASK 1] Figure 1. 33kV Feeder Over Current Protection - Overload Factor: 120\%. - Time Over Current Curve: IEC Standard Inverse. - Relay Current Pickup Range: 0.1-2.0A (0.1A step). - Time Over Current TMS Range: \( 0.1-1.0 \) (0.1 step). - TMS setting for R2 is 0.1. - Time over current pickup for R1 is \( 120 \% \) of CT secondary current. - Time Over Current Coordination time \( \Delta t: 0.5 \) seconds. - High-set (Definite Time) Setting for R1 and R2: 80\% of Short Circuit Current (IsC). - High-set (Definite Time) Over Current Pickup Range: 1 - 15A. - High-set (Definite Time) Set-point: R1-0.2s, R2-0.1 s a) Calculate Load Current, Time Overcurrent and High-set Pickup value for R2. [5 marks] b) Calculate Time Overcurrent pickup, TMS, and High-set Pickup value for R1. [5 marks] [TASK 2] a) Construct the power system model of TASK 1 in ETAP and run "Load Flow". - Attach the snapshot of load flow result with the current value. [3 marks] b) Run "Short-Circuit" Analysis on all the buses. - Attach the snapshot of the short circuit result with the current value. [5 marks] c) Configure the overcurrent protection using "Star Protection \& Coordination" based on the parameters from TASK \( 1 . \) - Attach the snapshot of "Star View". [7 marks] [Hint] - In "Power Grid - Short Circuit" Tap, "MVAsc" is 143 MVAsc \( (\sqrt{3} * 33 \mathrm{kV} * 2500 \mathrm{~A}) \) and "X/R" is 30 . - Select the correct CB and Cable from the library. (consider the rated voltage and load current.) - The lengh of the cable - Between Bus 1 and 2: \( 15 \mathrm{~km} \) - Between Bus 2 and 3: \( 5 \mathrm{~km} \) - In "Load", it assumes "\%PF" is 100 . - Use "GE Multilin 750/760" protection relay in the library. - In this case, disable "Neutral", "Ground" and "Sen. Ground" protections. (Only "Phase" protection is valid.) - Note: The fault current level can be slightly different due to the various cable types.


We have an Answer from Expert

View Expert Answer

Expert Answer


We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe