Home /
Expert Answers /
Civil Engineering /
solve-it-a-group-of-piles-is-required-to-support-a-structural-load-of-25000kn-circular-concre-pa387
(Solved):
solve it
A group of piles is required to support a structural load of 25000kN. Circular concre ...
solve it
A group of piles is required to support a structural load of 25000kN. Circular concrete piles 0.4m in diameter will be driven through 2.5m of soft clay, 6.5 m of firm-to-stiff clay into a deposit of dense gravel as shown in the figure below. The water table exists at depth 1m below ground level. Design the pile group assuming the following data. factor of safety =2.5 Assume the following design parameters a=0.5,Nc=9,?=1 and an efficiency E=0.75 Soil properties are as follows Clay fill and Soft clay have same properties y=18kN/m3 (above W.T) ysat=20kN/m3cu=12kN/m2,?u=0?? Firm-to-stiff clay: Ysat =19kN/m3 cu =55kN/m2 at depth 2. of 5kN/m2 per metre. ?u=0?. Ysat =21kN/m3Ks=2c?=0,??=40?(Nq=150)??=30??cu=55kN/m2 at depth 2.5m then increases linearly with depth at a rate Dense gravel: Ysat =21kN/m3Ks=2c?=0,??=40?(Nq=150)??=30?? General recommendations - The number of piles is to be determined as part of the design procedure - Negative skin friction is expected to take place in the layer of soft clay. - The total depth of piles should not exceed 25 meters.