11. Which requirements validation technique is based on traceability matrices?
A. Simple checks
B. Prototyping
C. Functional
11. Which requirements validation technique is based on traceability matrices? A. Simple checks B. Prototyping C. Functional tent design D. Inspections 12. Prototypes that provide a braod view of a system are called: A. Low fidelity prototypes C. Horizontal prototypes D. Vertical prototypes 13. With which requirements validation technique, tests can reveal problems in requirements? A. Simplechecks B. Functional test design C. Prototyping D. Inspections 14. In which requirements validation techniques, a moderator, authors and reviewers participate together in validating the requirements? A. Prototyping B. Functional test design C. Walkthroughs D. Formal inspections 15. Which one of the following requirements validations techniques is the most expensive? A. User manual development B. Prototyping C. Formal inspections D. Functional test design 16. In the "Critical, Important, Useful" technique, stakeholders are given: A. one-third of the votes from each category. B. half of the votes from each category. C. unlimited number of votes from each category. D. unequal number of the votes from each category. 17. When the cost of delay of two features is equal: A. Doing the Shortest Job First, produces the worst economic returns. B. Doing the Shortest dob First, produces the best economic returns. C. Doing the Longest Job First, produces the best economic returns. D. Doing the easiest Job First, produces the best economic returns. 18. If two features have the same effort: A. Do the feature with the lowest cost of delay first. B. It does not matter by which feature to start. C. Skip both features and select another one. D. Do the feature with the highest cost of delay first. 19. Communicates future objectives to our outside stakeholders. A. Requirement Road Map C. Product Road Map B. User Road Map D. None of these 20. The achieved solutions of conflict resolution may be forgotten and conflicts that have already. been resolved may recur if not A. Discarded C, Resolved B. Recommended D. Documented


We have an Answer from Expert

View Expert Answer

Expert Answer



A. Simple checks
C. Horizontal prototypes
B. Functio...
We have an Answer from Expert

Buy This Answer $5