(Solved): Q.5 An anchored sheet pile wall is used to carry out excavation to construct a tunnel with the cut a ...



Q.5 An anchored sheet pile wall is used to carry out excavation to construct a tunnel with the cut and cover method in a granular soil. The depth of excavation H is 8 m and the width of excavation B is 15 m. The shear strength ?’ of the soil is 35o.
Assume you have analyzed the problem and obtained a pile deflection profile that gives a deflection area of 85,000mm2. By using the Bowles’ Method, estimate the maximum settlement of the ground.

Settlement
Q.5 An anchored sheet pile wall is used to carry out excavation to construct a tunnel with the cut and cover metho
Settlement Q.5 An anchored sheet pile wall is used to carry out excavation to construct a tunnel with the cut and cover method in a granular soil. The depth of excavation is and the width of excavation B is . The shear strength of the soil is . Assume you have analyzed the problem and obtained a pile deflection profile that gives a deflection area of . By using the Bowles' Method, estimate the maximum settlement of the ground.


We have an Answer from Expert

View Expert Answer

Expert Answer


To estimate the maximum soil settlement, we can use the following steps:Step 1: Determine the passive soil resistanceThe passive soil resistance can b