Home / Expert Answers / Civil Engineering / design-a-completely-mixed-activated-sludge-process-using-three-different-design-approaches-i-e-pa855

(Solved): - Design a completely-mixed activated sludge process using three different design approaches (i.e. ...



- Design a completely-mixed activated sludge process using three different design approaches (i.e., calculate the volume of t

- Design a completely-mixed activated sludge process using three different design approaches (i.e., calculate the volume of the aeration basin). Base your design for the first approach on detention time, the second one on BOD loading, and the third one on kinetics. The influent design flow rate to the activated sludge process is day with a concentration of . Completely-mixed activated sludge processes typically have detention times ranging from 3 to 6 hours and biokinetic coefficients (Reynolds and Richards, 1996) used in design are: , and . Use a MCRT days and VSS.


We have an Answer from Expert

View Expert Answer

Expert Answer



First Approach:
Based on detention time
Given detention time t= 3 to 6 hours
Lets assume t= 4.5 hours
we know that,
  

Discharge = Volume of tank / detention time


so , Volume of detention tank,
V = Q*t
= 10000*(4.5/24)

Discharge Q = 10000m3/day , detention time t= 4.5 hours


= 1875 m3


We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe