(Solved):
Consider the proposed fill and soil profile shown in the figure below. The ultimate consolidation ...
Consider the proposed fill and soil profile shown in the figure below. The ultimate consolidation settlement is 0.50m. Do not apply any correction for the construction period. Using the simplified solution, compute the consolidation settlement at t?15 years after placement of the fill. How long will it take to reach 95%,98%, and 99% of the ultimate consolidation settlement? Use the simplified method.