Home / Expert Answers / Advanced Math / an-information-on-a-project-contains-in-a-table-below-each-activity-is-labeled-with-1-to-11-along-pa557

(Solved): An information on a project contains in a table below, each activity is labeled with 1 to 11 along ...




An information on a project contains in a table below, each activity is labeled with 1 to 11 along with
other information - t
An information on a project contains in a table below, each activity is labeled with 1 to 11 along with other information - time in week. 1) Lengkapkan maklumat di dalam kolum jadual projek iaitu "Jangkaan Masa & Varian". Complete information in the table's columns for the project "Expected Time & Variance". Activity 1 2 3 4 5 6 7 8 9 10 11 Predecessor 1,3 2 4 2 6,6 5 4,5 Optimistic 4 6 5 5 2 8 Most Likely 6 2 6 8 9 3 12 6 2 5 Pessi mistic 8 3 12 17 4 21 12 3 7 16 (4 Expected Time (t )/Normal Time 4+4(6)+8 6 1+4(2)+3 6 6+4(6)+12 6 5+4(8) +11 6 1+4(9)+17 6 2+4(3)+4 6 5+4(12)+21 6 5+4(6)+12 6 1+4(2)+3 6 2+4(5)+7 6 8+4(9)+16 6 2) Bina satu rajah rangkaian AON nod konfigurasi berdasarkan jawapan 1. Construct a figure of AON node configuration network based on answer 1. =2 3) Tentukan tempoh masa projek ini dapat diselesaikan dan laluan kritikal. Determine the time of the project can be completed and critical path. =7 =3 12.3 6.8 2 Markah/Marks) Variance -5 10 ¹²=0.44 0.11 7.11 0.11 7.11 0.16 0.11 0.69 1.78 (8 Markah/Marks) (2 Markah/Marks)


We have an Answer from Expert

View Expert Answer

Expert Answer


We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe