Home / Expert Answers / Operations Management / 1-use-a-a-level-production-strategy-and-b-chase-production-strategy-to-compute-the-monthly-pr-pa996

(Solved): 1. Use a (a) level production strategy and (b) chase production strategy to compute the monthly pr ...



1. Use a (a) level production strategy and (b) chase production strategy to compute the monthly production, ending inventory/

1. Use a (a) level production strategy and (b) chase production strategy to compute the monthly production, ending inventory/(backlog) and workforce levels for the following production plan. Assume that a worker can produce 50 units per month, the beginning inventory in April is 500 units, and the firm desires to have 300 units of inventory at the end of September. 2. Garden Inc. replenishes its two distribution centers in Jacksonville and Miami from its Atlanta central supply warehouse. The distribution schedule for one of its products for the next six weeks is shown below. Use proper distribution requirements planning logic to complete the replenishment schedules of the two distribution centers and the central supply warehouse. \[ \mathrm{Q}=\mathrm{LFL} ; \mathrm{LT}=2 ; \mathrm{SS}=2 \] \[ \mathrm{Q}=\mathrm{LFL} ; \mathrm{LT}=1 ; \mathrm{SS}=5 \] \[ \mathrm{Q}=\mathrm{LFL} ; \mathrm{LT}=1 ; \mathrm{SS}=0 \] All rights are reserved. The material contained herein is the copyright property of Embry-Riddle Aeronautical University, Daytona Beach, Florida, 32114. No part of this material may be reproduced, stored in a retrieval system or transmitted in any form, electronic, mechanical, photocopying, recording or otherwise without the prior written consent of the University. College of Business | worldwide.erau.edu 3. Given the following information, complete the planned order releases and projected on-hand balances for component part \( \mathrm{A} \). \( \mathrm{Q}=50, \mathrm{LT}=3 \) weeks, Safety Stock \( =10 \)


We have an Answer from Expert

View Expert Answer

Expert Answer


as per Chegg guidelines i could Solved first one ONLy don't give downvote please (a) Level production plan is following: Net requirement = Total demand + Ending inventory of September - Beginning inv
We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe

A PHP Error was encountered

Severity: Notice

Message: fwrite(): write of 34 bytes failed with errno=28 No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 267

Backtrace:

A PHP Error was encountered

Severity: Warning

Message: session_write_close(): Failed to write session data using user defined save handler. (session.save_path: /home/solutionspile.com/public_html/system/sessions)

Filename: Unknown

Line Number: 0

Backtrace: