1. For A LEED v4 Building Design and Construction prerequisite and credit, Indoor Water Use Reduction, complete the following

1. For A LEED v4 Building Design and Construction prerequisite and credit, Indoor Water Use Reduction, complete the following table: 2. List the Flush and Flow Fixtures that must be included in the Prerequisite and Credit for a LEED v4 Commercial Office project: 1. 2. 3. 4. 5. 3. A LEED Commercial Office project has 54 Fulltime Employees and 32 Halftime Employers. Calculate the total Baseline water usage for the flush fixtures using the table shown below. Show calculation for FTE. Use default value for gender ratio. Round to whole numbers (No decimal answers).


We have an Answer from Expert

View Expert Answer

Expert Answer


as per the Chegg guide
We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe